Case Study
Downtown restaurant RTU failure
A Tucson restaurant on 4th Avenue lost cooling an hour before dinner service when its rooftop unit fan motor seized. Crest Air dispatched within 90 minutes, swapped the motor, and recalibrated airflow so tables stayed seated and the kitchen never shut down. Result: zero revenue loss and a preventive maintenance plan scheduled for the off day.




